1. Before starting, water should be sent to check whether the water pipe is flowing smoothly and whether there is water leakage.
2. Check whether the three-phase power supply is normal.
3. Check whether the connection between the distribution cabinet and the induction furnace is intact, and there should be no metal objects on the induction ring to prevent the induction ring from burning the induction ring.
4. In the case of all the above, you can send the door board to control the power supply, and at the same time see whether the computer board detects "1" in turn, stop on "1" and flash, (detect from 9 to 1 in turn).
5. Turn the power adjustment potentiometer on the door panel counterclockwise to "0".
6. Press the main pass button, and the computer board shows that "A" is flashing.
7. Turn the heating start to the open position, and the computer board will display "A", and wait for heating without flashing.